07919 425664 mcleanuk@gmail.com

Cladding cleaning & high level clean to a long cladded section of a former Morrisons warehouse.

The whole building was being developed into a Tesco store (a large Tesco store).

Two sides had been cleaned so a full respray in Tesco colours could be carried out. This side needed some overhanging trees cut back and was part 2 of the project for us.

If cladding has overhanging trees next to it or is on the side of the building that doesn’t get sunlight then this is one of the effects.

With the right kit this can easily be resolved.

The side of the building is 130 metres in length – so plenty of high pressure hoses – check.

Access equipment narrow enough to get down the side walkway. The allowance on either side of the wheels was about 4 inches – check.

A water supply 200 metres away, enough low pressure hose to reach. This was not a job to keep getting down from the access and driving to fill up with water – check.

Cladding cleaning done properly, no compromise, no excuses, get on with it & get it done.

The results speak for themselves – check!